Operation
Putting into operation 9.1
27
[en-US] | 02/2022 | 5100063562 | AR54-64 | Operator’s Manual
9
Operation
9.1
Putting into operation
NOTICE
Tighten the fastening screws.
15-20 minutes after switching on. Switch off the machine and tighten all
fastening screws with a torque wrench.
Information
Machine without an on/off switch starts vibrating immediately after power
is applied.
9.2
Taking out of operation
Shut down the machine and disconnect it from the power source in the
following situations.
• Before work breaks.
• In a dangerous situation.
Machine without on/off switch
1.
Switch off the machine via the power source.
2.
Disconnect machine from power source.
ð
The machine is out of operation.
ð
Let the machine cool down.
9