CRT 48-31V-ES
Operation
wc_tx000143gb.fm
21
4.7
Operation
To utilize your WACKER Riding Trowel to its fullest capacity, the
machine should be driven in the direction that the operator is facing.
This will finish the widest possible area, while giving the operator an
excellent view of the slab surface about to be troweled. When the
machine reaches the end of the slab, make a 180° U-turn, and repeat
the straight line of direction to the other end of the slab.
Note:
During the break-in period, run the engine at 50% of full throttle.
Refer to Section New Machines.
NOTICE
: DO NOT
use excessive pressure on the control levers.
Excessive pressure does not increase the reaction time of the machine
and can damage the steering controls.
NOTICE
:
Attempting to use the trowel too early in the curing stage of
the concrete may result in an undesirable finish. Only experienced
concrete finishers should operate the trowel.
Summary of Contents for CRT 48-31V-ES
Page 2: ......
Page 10: ...Safety Information CRT 48 31V ES wc_si000050gb fm 8 2 5 Label Locations...
Page 11: ...CRT 48 31V ES Safety Information wc_si000050gb fm 9...
Page 33: ...CRT 48 31V ES Maintenance wc_tx000144gb fm 31...
Page 40: ...Maintenance CRT 48 31V ES wc_tx000144gb fm 38 Notes...
Page 41: ......
Page 54: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...