wc_tx004193gb_FM10.fm
33
CRT48
Operation
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2
Position of the Operator
Safe and efficient use of this machine is the operator’s responsibility. Full control of
the machine is not possible unless the operator maintains the proper working
position at all times.
While operating this machine the operator must:
■
be seated in the operator’s seat facing forward
■
have both feet on the control deck
■
have both hands on the steering levers
Adjusting the
steering
levers
The steering levers can be adjusted between two positions. With the steering
levers set in the highest position, there will be a longer stroke. To adjust the
position of the steering levers:
1. Remove the four bolts and nuts
(a)
.
2. Set the steering levers in the desired position.
3. Re-assemble the four bolts and nuts.
wc_gr013235
a
a
Summary of Contents for CRT48-35L
Page 6: ...6...
Page 10: ...Table of Contents CRT48 10...
Page 19: ...wc_si000969gb_FM10 fm 19 CRT48 Safety Information Notes...
Page 80: ...wc_td000668gb_FM10 fm 80 Technical Data CRT48 Notes...
Page 93: ......
Page 106: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...
Page 107: ...CRT 48 Schematics wc_tx004197gb_FM10 fm 107 14 Schematics Notes...
Page 114: ......
Page 115: ......