Operation
T00988GB.fm
19
2. Push decompression lever upwards.
3. Insert crank (24) into the bushing.
4. After having engaged the automatic decompression system to the
stop position, the engine will require five full turns of the crank until
the engine regains its compression and fires up.
5. Stand beside the engine (feet slightly apart), viewing in the forward
direction.
6. Place one hand on the machine an crank with the other hand.
Keep a firm hold of the crank while cranking in order to avoid the risk
of sudden slippage.
7. Turn crank slowly at first until crank engages and then increase
cranking speed.
8. As soon as the engine is running, remove crank (24).
9. Turn throttle control lever (8) into idling position, allow engine to
warm up for 7 minutes at idling speed.
Note: Do not activate automatic decompression lever while the engine is
running.
Wait until the engine stops before repeating the starting procedure.
Summary of Contents for DPU 4045H
Page 1: ...www wackergroup com Operator s Manual Vibratory plate DPU 4045H 0109984en 003 04 2008 ...
Page 2: ......
Page 4: ...T00940GB fm 2 ...
Page 34: ......
Page 37: ......
Page 38: ......