BA D18 us* 1.1 * D18i400.fm
4-33
Putting into operation 4
Putting into operation for the first time and running-in period
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
•
Check the fluid levels according to chapter “
Maintenance
”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
•
Do not load a cold engine.
•
Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
•
Do not change engine speed abruptly.
•
Avoid using the machine under heavy loads or at high speeds.
•
Avoid abrupt acceleration, braking and changing travel direction.
•
Do not run the engine at high speed for extended periods.
•
Observe the maintenance plans
– see chapter “7.2 Maintenance
Equipment for Austrian road traffic regulations StVZO (option)
Information
Observe the national and regional regulations during machine travel on
public roads.
Scope of delivery of option
Equipment for Austrian road traffic
regulations StVZO
:
•
Headlights and rear lights
•
Turn indicators and clearance lights
•
Rotating beacon
•
Horn on steering-column lever
•
Outside rearview mirrors on left and right
•
Numberplate bracket and lights
•
Wheel chock
The rear light unit
A
can be folded in for protection during machine
operation on non-public sites.
1. Remove lock pin
B
from the lock.
2. Fold the rear light unit
A
under the protection.
3. Insert lock pin
B
back into the lock.
Fig. 92
A
B
Summary of Contents for DW100
Page 18: ...1 8 BA D18 us 1 1 D18v100 fm 1 Foreword Notes...
Page 46: ...3 8 BA D18 us 1 1 D18e300 fm 3 Introduction Warning labels Fig 9...
Page 50: ...3 12 BA D18 us 1 1 D18e300 fm 3 Introduction Information labels Fig 20...
Page 54: ...3 16 BA D18 us 1 1 D18e300 fm 3 Introduction ANSI label option Fig 36...
Page 60: ...3 22 BA D18 us 1 1 D18e300 fm 3 Introduction Notes...
Page 144: ...6 10 BA D18 us 1 1 D18t600 fm 6 Transportation Notes...
Page 200: ...8 8 BA D18 us 1 1 D18b800 fm 8 Malfunctions Notes...
Page 216: ...9 16 BA D18 us 1 1 D18t900 fm 9 Technical data 9 15 Dimensions Front skip overview...
Page 218: ...9 18 BA D18 us 1 1 D18t900 fm 9 Technical data Swivel skip with rollbar overview...
Page 220: ...9 20 BA D18 us 1 1 D18t900 fm 9 Technical data Swivel skip with cabin overview...
Page 222: ...9 22 BA D18 us 1 1 D18t900 fm 9 Technical data...
Page 226: ......
Page 227: ......