3-6
BA 1404 en – Edition 2.7 * * 1404b320.fm
Operation
3.5
Putting into operation
Safety instructions
• Only use the steps and handholds provided when entering and leaving the cabin
• Never use the controls or movable lines and cables as handholds
• Never get on a moving machine. Never jump off the machine
• Refer to the corresponding load diagrams for the boom
Putting into operation for the first time
Important information
• The machine may only be put into operation by authorized personnel!
Selection and qualification of personnel, basic responsibilities
• The personnel must have read and understood this Operator’s Manual before putting
the machine into operation
• The machine may only be used in technically perfect condition in accordance with its desig-
nated use and the instructions set forth in the Operator’s Manual, and only by safety-conscious
persons who are fully aware of the risks involved in operating the machine
• Go through the “Start-up” checklist in the following chapter
Running-in period
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not change engine speed abruptly
• Avoid using the machine under heavy loads and/or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods
• Strictly observe the maintenance schedules in the appendix
Summary of Contents for E09-01
Page 8: ...1 6 BA 1404 en Edition 2 7 Ba1404en2_7IVZ fm Table of contents...
Page 23: ...BA 1404 en Edition 2 7 1404b110 fm 1 13 Introduction Overview of safety labels...
Page 171: ...BA 1404 en Edition 2 7 1404b560 fm 5 43 Maintenance DIN 51 502 DIN 51 825 1000156007 1...
Page 172: ...5 44 BA 1404 en Edition 2 7 1404b560 fm Maintenance...