7-40
BA ET16 de* 1.0 * et16w710.fm
7 Maintenance
Checking the hydraulic system for leaks and general condition
Check the hydraulic system and hoses daily for leaks and general
condition.
Information
Leaks and damaged pressure lines must be immediately repaired or
replaced by an authorised service centre. This not only increases the
operating safety of the machine but also helps to protect the environment.
►
Have damaged or leaky pressure lines immediately repaired or
replaced by a Wacker Neuson service center.
►
Have hydraulic hoses replaced every 6 years from the date of
manufacture, even if they do not seem to be damaged.
In this respect, Wacker Neuson recommends that you observe all the
relevant safety regulations for hydraulic lines, as well as the safety
regulations regarding accident prevention and occupational medicine in
your country. Also observe DIN 20 066, TI. 5.
The article number is on the clamping section of each hose connection.
The date of manufacture is indicated on each flexible line.
Have the respective line replaced immediately if one of the following
problems is detected:
• Damaged or leaky hydraulic seals.
• Worn or torn shells or uncovered reinforcement branches.
• Expanded shells in several positions.
• Entangled or crushed movable parts.
• Foreign bodies jammed or stuck in protective layers.
Summary of Contents for ET09-02
Page 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Page 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Page 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Page 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Page 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Page 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Page 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...