![background image](http://html1.mh-extra.com/html/wacker-neuson/ez17/ez17_operators-manual_3134811170.webp)
7-24
OM EZ17 us 1.0 * ez17w700.fm
7
7.6
Lubrication work
Preparing lubrication
1. Stop the machine on firm, level and horizontal ground.
2. Position the boom straight ahead at the center of the machine.
3. Lower the boom and the stabilizer blade to the ground.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
7. Remove the starting key and carry it with you.
8. Remove loose objects from inside the machine.
9. Close and lock the engine cover and the other covers.
10.Attach a warning label to the control elements (for example “Machine
being serviced, do not start”).
11.Wait at least 10 minutes after stopping the engine!
Fig. 188
Summary of Contents for EZ17
Page 12: ...1 6 OM EZ17 us 1 0 ez17v100 fm 1 Notes...
Page 38: ...3 10 OM EZ17 us 1 0 ez17e300 fm 3 Warning labels Fig 11 symbolic representation...
Page 43: ...OM EZ17 us 1 0 ez17e300 fm 3 15 3 Labels Fig 24 symbolic representation...
Page 48: ...3 20 OM EZ17 us 1 0 ez17e300 fm 3 Notes...
Page 138: ...5 56 OM EZ17 us 1 0 ez17b510 fm 5 Notes...
Page 146: ...6 8 OM EZ17 us 1 0 ez17t600 fm 6...
Page 198: ...7 52 OM EZ17 us 1 0 ez17w710 fm 7 Notes...
Page 202: ...8 4 OM EZ17 us 1 0 ez17b800 fm 8 Notes...
Page 222: ...9 20 OM EZ17 us 1 0 ez17t900 fm 9 Dimensions Overview EZ17 Fig 227...