Operating the Machine
50Hz Mobile Generators
wc_tx000884gb.fm
26
3.7
Preliminary Checklist
Prerequisites
Machine on a flat, horizontal surface
Wheels of trailer chocked
Procedure
Have a certified electrician set up the generator. Complete the following preliminary
checks before putting the generator into service.
1. Make a walk-around inspection of the generator. Open side doors and visually
inspect engine compartment for obvious damage or the presence of foreign
objects which might affect operation.
2. Fill the engine cooling system with coolant. See the engine manual.
3. Check and fill the engine sump with oil. See the engine manual.
4. Check the engine air filter.
5. Check the fuel level. Fill the fuel tank if necessary.
6. Remove the grounding stake
(a)
from the machine and drive it into the ground.
7. Connect the cable form the grounding stake to the machine at the grounding
location
(b)
.
8. Connect the battery.
Summary of Contents for G 43
Page 1: ...Mobile Generator G 43 OPERATOR S MANUAL 0175257en 001 0608 0 1 7 5 2 5 7 E N...
Page 2: ......
Page 4: ...Foreword G 43 wc_tx000898gb fm 4...
Page 13: ...50Hz Mobile Generators Safety Information wc_si000271gb fm 13 Notes...
Page 18: ...Transporting Lifting and Storing 50Hz Mobile Generators wc_tx000895gb fm 18 Notes...
Page 48: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 48 5 Schematics 5 1 Power Wiring...
Page 50: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 50 5 3 Engine Wiring...
Page 52: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 52 5 5 Socket Wiring...
Page 54: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 54 5 7 Control Wiring...
Page 57: ...50Hz Mobile Generators Basic Troubleshooting wc_tx000896gb fm 57...
Page 60: ...Technical Data G 43 wc_td000277gb fm 60 7 3 Dimensions...
Page 62: ......
Page 64: ......