Operation
PT 3 / PT 3A / PT 3H
22
wc_tx001779gb.fm
4
Operation
4.1
Preparing the Machine for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1
Make sure all loose packaging materials have been removed from the
machine.
4.1.2
Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3
Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4
Attach component parts not already attached.
4.1.5
Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6
Move the machine to its operating location.
Summary of Contents for PT 3H
Page 1: ...5000185222 11 0711 5 0 0 0 1 8 5 2 2 2 Operator s Manual Pump PT 3 PT 3A PT 3H EN...
Page 6: ......
Page 25: ...PT 3 PT 3A PT 3H Operation wc_tx001779gb fm 25...
Page 43: ...PT 3 PT 3A PT 3H Maintenance wc_tx001776gb fm 43 d a b c e h g g f h wc_gr008242...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......