Maintenance
PT 3 / PT 3A / PT 3H
32
wc_tx001776gb.fm
5
Maintenance
5.1
Maintaining the Emission Control System
Normal maintenance, replacement, or repair of emission control
devices and systems may be performed by any repair establishment
or individual; however, warranty repairs must be performed by a
dealer/service center authorized by WACKER NEUSON. The use of
service parts that are not equivalent in performance and durability to
authorized parts may impair the effectiveness of the emission control
system and may have a bearing on the outcome of a warranty claim.
5.2
Periodic Maintenance Schedule
The chart below lists basic machine and engine maintenance. Refer to
your engine operator’s manual for additional information on engine
maintenance.
Pump
Daily
before
start-
ing
After
first
20 hrs.
Every
50
hrs.
Every
100
hrs.
Every
300
hrs.
Check external hardware.
Inspect for leaks between pump and
engine.
Remove cover and clean sediment out
of pump housing.
Check housing cover O-rings.
Inspect shockmounts for damage.
Summary of Contents for PT 3H
Page 1: ...5000185222 11 0711 5 0 0 0 1 8 5 2 2 2 Operator s Manual Pump PT 3 PT 3A PT 3H EN...
Page 6: ......
Page 25: ...PT 3 PT 3A PT 3H Operation wc_tx001779gb fm 25...
Page 43: ...PT 3 PT 3A PT 3H Maintenance wc_tx001776gb fm 43 d a b c e h g g f h wc_gr008242...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......