Maintenance
RCE
32
Operator’s manual
8
Maintenance
8.1
Maintenance schedule
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety instructions of this operator's manual, see chapter
Safety information
.
WARNING
Electrical voltage.
Injuries from electrocution.
f
Remove the plug from the plug receptacle before all work on the machine.
Task
Daily
before
operation
As
required
Every
2 years
Check power cable for perfect
condition – if power cable is
defective, have it replaced.*
* Have these tasks carried out by the service department of your Wacker
Neuson contact person.
Visual inspection of all parts
for damage.
Check knife for wear – if
necessary, replace knife.
Check screws on machine for
tightness – if necessary,
tighten them.
Check the hydraulic oil tank
level for power loss or leaking
hydraulic oil – if necessary
add hydraulic oil.
Change hydraulic oil.
Summary of Contents for RCE
Page 1: ...Operator s manual Cutting machine RCE 0215051en 003 12 2009 ...
Page 50: ...Technical data RCE 50 Operator s manual ...
Page 54: ......
Page 55: ......
Page 56: ......