Excavation work
Soft material:
Lower the bucket to the ground to lift out soft material and
tilt the bucket forward until you have a digging angle. If you
start driving the loader forward now, the bucket‘s digging
edge will break into the ground. Now make the tilting angle
flat to remove as even a layer as possible and to avoid a
large amount of wheel slip (Fig. 45).
Resistant material:
Lower the bucket to the ground to lift out resistant material
and tilt the bucket forwards until you have a digging angle.
When you drive the loader forwards now, slightly press the
bucket downwards so that it can break into the ground.
Should the bucket‘s digging angle penetrate the ground,
make the tilting angle flatter. Use the bucket curl control
lever to produce an up-and-down movement of the digging
edge of the bucket (Fig. 46).
Fig. 45
Excavation work 4
Fig. 46
Excavation work 5
Summary of Contents for WL 30
Page 1: ...www wackerneuson com Operator s Manual Wheel Loader WL 30...
Page 2: ...December 10 Edition...
Page 17: ...BASIC INFORMATION 15 WL30...
Page 48: ...TECHNICAL DATA 46 3 4 Dimensions Fig 11 Dimensions...
Page 61: ...Description of the indicator warning and control elements 59 WL30...
Page 126: ...Towing and transporting 124 Fig 58 Tying down the loader...
Page 161: ...SERVICING AND INSPECTION 159 WL30 2 1 Fig 63 Cab tilt lever...
Page 235: ...Appendix 233 WL30 For personal notes...
Page 245: ...List of figures 243 WL30...