SECURINg THE LOADE R
129
W L 30
9
SECURING THE LOADER
The following instructions apply to stopping and
parking the loader after daily operation, transport-
ing the loader and to all servicing, inspection and
repair work.
•
Place the loader on an even, dry surface that can sup-
port sufficient weight.
•
Lower the loader lift arms.
•
Engage the parking brake and stop the engine.
•
Switch off all electrical switches.
•
Relieve the pressure in all hydraulic circuits by cycling
the controls after the engine has stopped.
•
Secure the loader with the wheel chock.
•
Clean dirt off the loader.
•
Perform a visual inspection to make sure there are no
leaks:
-
in the hydraulic system
-
in the cooling system
-
in the fuel system
•
Perform a visual inspection for damage to the loader,
especially on the tires, attachments and locking mecha-
nism for the attachments.
•
Fill the fuel reservoir and check the operating level of
the other fluid reservoirs after the temperature has been
reduced to a level that is comfortable to touch.
•
Secure the loader against unauthorized use:
-
Remove the starting key
-
Close the windows, doors, reservoir lid and engine en-
closure.
Summary of Contents for WL 30
Page 1: ...www wackerneuson com Operator s Manual Wheel Loader WL 30...
Page 2: ...December 10 Edition...
Page 17: ...BASIC INFORMATION 15 WL30...
Page 48: ...TECHNICAL DATA 46 3 4 Dimensions Fig 11 Dimensions...
Page 61: ...Description of the indicator warning and control elements 59 WL30...
Page 126: ...Towing and transporting 124 Fig 58 Tying down the loader...
Page 161: ...SERVICING AND INSPECTION 159 WL30 2 1 Fig 63 Cab tilt lever...
Page 235: ...Appendix 233 WL30 For personal notes...
Page 245: ...List of figures 243 WL30...