43
VAS 581 001A
Operation
8.7.3
Filling process
1. Select desired settings and press
ENTER
to confirm.
2. If
“Filling phase”
has been selected, enter the desired values,
otherwise continue with chapter “Selecting connections” on page 44.
3. Enter the amount of refrigerant oil which was previously drained or
which is required.
4. Press the cursor key
.
5. Enter the amount of additive.
6. Press the cursor key
.
7. Enter the amount of refrigerant.
8. Confirm all settings with
ENTER
.
I
Filling phase?
Yes
No
ENTER-OK STOP-EXIT
PAG oil
ml.
0
UV additive
ml.
7
Refrigerant
g.
500
ENTER-OK STOP-EXIT
NOTE
If an extraction process takes place in the same process, the
quantity of fresh oil counts as an extra filling quantity, which is added
to the previously extracted quantity of used oil. If you set this value
to 0, the exact amount of oil that has been extracted is also refilled.
To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
VAS-581-001A--O-US.book Seite 43 Montag, 17. Februar 2020 8:25 20