EN
Operation
VAS 6380B / VAS 6381B
106
8.8.3
Filling process
1. Enter the preferred settings and press
ENTER
to confirm.
2. If
“Filling phase?”
has been selected, enter the required value, oth-
erwise continue with chapter “Selecting connections” on page 107.
3. Enter the refrigerant oil quantity.
4. Press the cursor key
.
5. Enter the additive quantity.
6. Press the cursor key
.
7. Enter the refrigerant quantity.
8. Press
ENTER
to confirm all settings.
I
F i l l i n g p h a s e ?
Yes
No
E N T E R - O K S T O P - E X I T
⬍
P A G O i l
m l .
0
U V T r a c e r
m l .
7
R e f r i g e r a n t
g .
500
E N T E R - O K S T O P - E X I T
⬍
NOTE
If extraction is taking place in the same process sequence, the
quantity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
WaecoVAS6380B-6381B_OPM_4445101232_EMEA(de-en-es-fr-ru)_202x-xx-xx.book Seite 106 Montag, 2. November 2020 1:46 13