EN
Operation
VAS 6380B / VAS 6381B
110
23. If necessary, use the keypad (
7
) to enter the data and press
ENTER
to confirm.
If no data is to be entered, press
ENTER
to switch to the next
program step.
24. Deselect
“Rec/Recycling phase ?”
using
No
(the setting flashes)
and press
ENTER
to confirm.
25. Select
“Vacuum phase ?”
(the setting flashes) and press
ENTER
to
confirm.
26. If necessary, use the keypad (
7
) to enter the data and press
ENTER
to confirm.
If no data is to be entered, press
ENTER
to switch to the next pro-
gram step.
27. Select
“Filling phase?”
(the setting flashes) and press
ENTER
to
confirm.
28. Enter the refrigerant filling quantity (note the oil filling quantity of the
compressor).
29. Then follow the instructions on the display (
6
):
Select the setting (which then flashes) and press
ENTER
to confirm.
30. Select
“Process start ?”
by pressing
ENTER
.
✓
After filling is complete, you will be prompted to disconnect the hoses
of the AirConServiceCenter from the vehicle air conditioning system.
31. Disconnect the service hoses (
10
) and (
11
) and press
ENTER
to
confirm.
The service hoses are then emptied. The device is then ready for
further use.
32. Put the valve caps of the vehicle air conditioning system back on the
connections.
WaecoVAS6380B-6381B_OPM_4445101232_EMEA(de-en-es-fr-ru)_202x-xx-xx.book Seite 110 Montag, 2. November 2020 1:46 13