WAFER GSM-CTL-AC REMOTE CONTROL UNIT
http://www.waferstar.com
INSTALLATION
To install the GSM-CTL-AC, you need to power on the board with AC100V to 230V. and
also connect the relay output according to your project. The relay contacts can stand
230V 30A
maximum
, this is enough for its operation but
don't try to switch higher voltages or currents
.
You should install the GSM-CTL-AC in a place where there is GSM signal coming from the
operator you want to use. Check it with a phone before proceeding with the installation. If you
need to install the device in a place with little signal, you may consider using an external antenna
that we may supply as an option to be purchased separately with 50cm cable.
You should then insert the SIM Card of the operator you want to use with the right direction
according to the following pictures.
!Note! : You must remove the PIN request from the SIM before inserting it in the
unit
, otherwise the device will not work. In order to do so, insert the SIM in a phone and
disable the PIN request (usually there is a security menu that enables you to do so).
1.Slide back the SIM door and
lift it up
2.Slide the SIM Card into the
SIM door making sure that
the clipped corner of the SIM
card lines up with the clipped
corner of the SIM holder
3.Close the SIM door
4.Slide the SIM door to lock the
SIM card in place
Please read this entire manual before installation !!!!
z
Take EXTREME care with the high voltage Power line installation
z
In case of fault,pull out the main plug immediately.
z
If device is connected into electricity, you couldn’t take off its cover.
z
To maximise reception, install the GSM antenna in a prominent elevated position
if possible, and vertically mounted.