47
GA 5000EA
OPERATING MANUAL
VERSION 09/2016
ORDER NUMBER DOC2360924
6.7
COMMISSIONING
6.7.1
SAFETY INSTRUCTIONS
Observe the safety instructions in Chapter 4 and Chapter 7.2.
Observe the general rules for making adjustments to the spray gun Chapter 7.2.2.
6.7.2
PREPARATION FOR COMMISSIONING
Impurities in the spraying system!
Spray gun blockage.
Flush the spray gun and paint supply with a suitable fl ushing agent before
commissioning.
NOTICE
6.7.3
COMMISSIONING
The following points should be noted before commissioning:
Make sure that all other conductive parts within the work area are grounded.
Lock the external release with the exhaust air unit.
Lock the external release with an appropriate tool (e.g., key switch) (the high-voltage
supply must be secured to prevent unauthorized persons from switching it on).
Check that all product-conveying connections are correctly connected.
Check that all air-conveying connections are correctly connected.
Visually check the permissible pressures for all the system components.
Check the level of the separating agent in the pump and fi ll up if necessary.
Provide product tank, tanks for fl ushing agent and an empty tank for return fl ow.
The interface on the rear of the control unit must be protected with a cover.
Connect the system to the air supply.
When fi rst commissioning the unit Flush the system in accordance with the operating
manuals for the other components.
Summary of Contents for GA 5000EAEC
Page 2: ......
Page 106: ...106 GA 5000EA OPERATING MANUAL VERSION 09 2016 ORDER NUMBER DOC2360924...
Page 107: ......