26
GM 2800EA
OPERATING MANUAL
EDITION 10/2005
PART NO. DOC0388891
5.3.2
PREPARATION
•
Secure the spraygun. Turn tension cap clockwise until stop. (viewed from back of gun)
•
Connect material hose to pump.
•
Connect air hose to oilfree, dry air supply approx. 0.25 MPa; 2.5 bar; 36 psi with regulator.
•
Connect electric cable of the spray gun to the control unit.
•
Visually check the permissible pressures for all the unit components.
•
Make sure that the spraying unit and all other conductive parts within the work area are
earthed.
•
Set material pressure and use a suitable medium (solvent or water) to check that connec-
tions do not leak.
•
Relieve unit pressure and secure the spraygun.
5.3
START-UP
5.3.1
GENERAL RULES FOR MAKING ADJUSTMENTS TO THE SPRAY GUN
➞
See
safety regulations
in chapter 2.
$!.'%2
(IGHVOLTAGElELD
$ANGERTOLIFEFROMMALFUNCTIONINGHEARTPACEMAKERS
%NSURETHATPERSONSWITHHEARTPACEMAKERS
$ONOTWORKWITHTHEELECTROSTATICSPRAYGUN
2EMAIN OUTSIDE THE AREA OF THE ELECTROSTATIC SPRAY GUNWORK
PIECE
3)()??'"
3)()??'"
7!2.).'
5NINTENTIONALPUTTINGINTOOPERATION
2ISKOFINJURY
"EFOREALLWORKONTHEUNITINTHEEVENTOFWORKINTERRUPTIONSAND
FUNCTIONALFAULTS
3WITCHOFFTHEENERGYCOMPRESSEDAIRSUPPLY
2ELIEVETHEPRESSUREFROMTHESPRAYGUNANDUNIT
3ECURETHESPRAYGUNAGAINSTACTUATION
"YFUNCTIONALFAULTS)DENTIFYANDCORRECTTHEPROBLEMPROCEED
ASDESCRIBEDINCHAPu4ROUBLESHOOTINGh