6 ASSEMBLY AND COMMISSIONING
6.1 TRAINING OF ASSEMBLY/COMMISSIONING PERSONNEL
4
The assembly and commissioning personnel must have the technical skills to safely
commission the device.
4
When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is
assembled and commissioned.
6.2 STORAGE CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3 INSTALLATION CONDITIONS
The air temperature at the installation site must be in a range between 0 °C and 40 °C; 32 °F
and 104 °F.
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
6.4 PREPARATION OF THE SPRAY GUN
6.4.1 Selection of a Suitable Nozzle System
The process of changing from the flat jet nozzle to the deflector cone is described in Chapter
Changing Nozzle Types [
You will find the article numbers of the different nozzles in Chapter Accessories [
Nozzle
Application overview
Powder cloud
Flat jet nozzle
P_04985
Complex part geometries
Flat work pieces (reduced
picture frame)
Profile
Undercuts
Widely spread flat powder cloud
Deflector cone
P_01665
Wire goods
Grid designs
Small components
Round powder cloud
Size of the powder cloud is de-
pendent on the deflector plate
diameter