37
PEM-X1
OPERATING MANUAL
VERSION 03/2014
ORDER NUMBER DOC 2326020
The maintenance intervals should be adapted by the operator depending on the level of
use and if necessary the level of soiling.
If in doubt, we recommend contacting J. Wagner AG's specialist personnel.
The valid health and safety specifi cations and safety instructions provided in Chapter 4
must be adhered to for all maintenance work.
Maintenance work
Point in time
per shift
weekly
Blow out gun and check for sintering
Check gun settings
Check gun discharge pressure
Blow out powder hoses
Check grounding
Check compressed air quality
Check gun voltage
Check powder hoses for bends and sintering
8.2.3
MAINTENANCE PROCEDURES
Incorrect maintenance!
Risk of injury and damage to the device.
If contact with powder products or cleaning agents causes skin
irritation, appropriate precautionary measures must be taken,
e.g., wearing protective clothing.
The footwear worn by operating staff must comply with
EN ISO 20344. The measured insulation resistance must not
exceed 100 megohms.
The protective clothing, including gloves, must comply with
EN ISO 1149-5. The measured insulation resistance must not
exceed 100 megohms.
WARNING