49
PEM-X1
OPERATING MANUAL
VERSION 09/2012
ORDER NUMBER DOC 2326020
9.1
OVERVIEW OF INSPECTIONS
S
e
c
tion
T
y
pe of inspec
tion
Requir
emen
ts
Inspec
tion
by
T
y
pe of inspec
tion
Inspec
tion
in
ter
v
al
1
Eff
ec
tiv
eness of t
echnical
v
e
ntilation check
Eff
ec
tiv
eness of t
echnical
v
e
ntilation check
UP/BP
ME
M
easur
ements of air fl
o
w
speed /
air quantities
Check the diff
er
ential
pr
essur
e
indicat
o
r.
C
o
ntinuously
2
In
te
rlock bet
w
een t
echnical
v
e
ntilation and high-v
oltage
,
compr
essed air and c
o
ating
mat
e
rial supply
T
he t
echnical v
e
ntilation should
be int
e
rlocked such that the high-
v
oltage cannot be swit
ched on
while the t
echnical v
e
ntilation is
not w
o
rk
ing eff
ec
tiv
ely
.
BP
FU
Test whether the sy
st
em is saf
ely
st
opped and the mat
e
rial supply
,
supply air and high-v
oltage
ar
e swit
ched off
when the
v
e
ntilation is shut do
wn.
Annually
3
Eff
ec
tiv
eness of g
rounding
measur
es
All the sy
st
em
's c
onduc
tiv
e
elements
, such as fl
oors
,
walls
,
ceilings
, pr
ot
ec
tiv
e g
rating
,
transpor
t equipment, w
o
rk piec
es
,
po
w
der c
o
ntainers
, machines or
construc
tion par
ts et
c.
in the spra
y
ar
ea, with the ex
ception of par
ts
which carr
y
high-v
oltage during
operation, must be c
onnec
ted t
o
the g
rounding sy
st
em. P
a
rts of
the booth must be g
rounded in
ac
co
rdanc
e with EN 12215.
BP
SI/ME/SÜ
V
isual check of g
round
connec
tions
, per
fo
rm func
tion
test on g
rounding swit
ch,
measur
ement of g
rounding
resist
ors
.
W
eek
ly
Ke
y
:
HE = M
anufac
tur
er
A
G
= Emplo
y
e
r
BP = C
apable person
BSB = F
ir
e
saf
et
y eng
ineer
EFK = Elec
trician
UP =
T
rained person
FU = F
unc
tion inspec
tion
ME = M
easur
ement
OP = Standar
d inspec
tion
SI =
V
isual inspec
tion
SÜ = C
o
ntinuous inspec
tion
TP =
Technical inspec
tion