51
PEM-X1
OPERATING MANUAL
VERSION 09/2012
ORDER NUMBER DOC 2326020
S
e
c
tion
T
y
pe of inspec
tion
Requir
emen
ts
Inspec
tion
by
T
y
pe of inspec
tion
Inspec
tion
in
ter
v
al
6
M
easur
es t
o
take if the w
o
rk piec
es
ar
e insuffi
ciently
g
rounded
If
suffi
cient w
o
rk piec
e g
rounding
in ac
co
rdanc
e with sec
tion 6
cannot be ensur
ed
, appr
opriat
e
equipment, e
.g
. ioniz
ers
, ma
y be
used t
o
dischar
ge elec
tric char
ges
on the w
o
rk piec
e
. Such equipment
must not ex
ceed the permitt
ed
dischar
ge ener
gy of the spra
y
sy
st
ems with which it is used
. I
n
te
rms of permitt
ed dischar
ge
ener
gy
, this equipment must be
put thr
ough the same inspec
tions
as the po
w
der spra
y
sy
st
ems used
with it.
T
he dischar
ge equipment
must be int
e
rlocked with the spra
y
sy
st
em such that the high-v
oltage
is swit
ched off
and that c
o
ating
cannot take plac
e if the dischar
ge
equipment malfunc
tions
.
BP
ME/FU/SÜ
M
easur
ement of dischar
ge
ener
gy
, check the monit
oring
equipment's t
est func
tion b
y
triggering it.
W
eek
ly
7E
ff
ec
tiv
eness of the manually
or aut
omatically ac
tuat
ed fi
re
ex
tinguishing sy
st
ems (r
oom
pr
ot
ec
tion sy
st
em)
Eff
ec
tiv
eness of the manually
or aut
omatically ac
tuat
ed fi
re
ex
tinguishing sy
st
ems (r
oom
pr
ot
ec
tion sy
st
em).
HE/BSB
FU
T
rigger fi
r
e
ex
tinguishing
sy
st
em, obser
v
e
manufac
tur
er's
requir
ements
6 months
Ke
y
:
HE = M
anufac
tur
er
A
G
= Emplo
y
e
r
BP = C
apable person
BSB = F
ir
e
saf
et
y eng
ineer
EFK = Elec
trician
UP =
T
rained person
FU = F
unc
tion inspec
tion
ME = M
easur
ement
OP = Standar
d inspec
tion
SI =
V
isual inspec
tion
SÜ = C
o
ntinuous inspec
tion
TP =
Technical inspec
tion