6.3
TRANSPORTATION
6
ASSEMBLY AND COMMISSIONING
6.1
TRAINING ASSEMBLY/COMMISSIONING STAFF
6.2
STORAGE AND INSTALLATION CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms. For specifi cations
of temperatures and relative humidity, see, technical data (Chapter 5.5.3).
Long-term storage
: Thoroughly clean the pump, if a long-term decommissioning is
planned. See Chapter "Cleaning". For recommissioning, proceed according to following
chapters.
A skilled person must check to ensure that the device is in a reliable state after it is installed
and before commissioning.
The assembly and commissioning staff must have the technical skills to safely commission
the device.
When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
Weight:
see Chapter 5.5.4
When lifting the system, always make sure that it remains
in balance.
Only lift at transport bracket.
(Lifting eye nut at the air motor = option)
Transport box: see Chapter 5.5.4
Summary of Contents for PROTEC 2K
Page 2: ......
Page 21: ...21 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 38: ...38 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 110: ...110 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 120: ...120 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 131: ......