Installation Pipe System
TITANUS
SUPER·SENS
®
6
– 8
Data: 02/09
TSS_06_A-en-e
6.3 Ceiling lead through
Fig.
6.4: To install the ceiling feed-through use the following steps:
n
Before
gluing remove dirt and grease with the recommended
cleaner.
o
Glue the hose connector to the corresponding T-piece with Tangit
glue.
p
For each ceiling feed-through drill a hole of
∅
13mm through the
false ceiling.
q
Install the lead-through by first removing the nut, pushing the hose
sleeve from the bottom through the bore hole and then re-placing
and tightening the nut above the false ceiling.
r
Determine the required length and cut the air sampling hose. Attach
the hose to the sleeve of the ceiling feed-through and the hose con-
nector at the T-piece of the air sampling pipe. If necessary soften
the hose ends with a hot air fan.
s
Stick the correct aspiration-reducing film sheet (according to pipe
design guidelines) to the ceiling feed-through.