Installation Pipe System
TITANUS
SUPER·SENS
®
6
– 16
Data: 02/09
TSS_06_A-en-e
The following steps should be taken for the blow-through process:
1. Connect the compressed air supply (compressor or mobile blow-
through device) for the blow-through of the pipes to the 3-way sleeve
ball valve via the quick-acting coupling sleeve.
2. Separate the pipes to be blown through from the relevant device via
the 3-way ball valve by re-setting the ball valve from operating position
0º to 180º (see fig. 6.11).
3. Manually blow the pipe system through for 10 seconds.
4. Set the ball valve to 90°. In this position the device is neither con-
nected to the pipe system nor the pressed or compressed air supply.
Wait for about 20 seconds so that the dust and dirt disturbed in the
pipe system can settle and not be aspirated by the smoke detection
system.
5. Re-connect the blown-through pipes with the device within the next 10
second by re-positioning the ball valve to 0º.
A single blow-through process must be completed in 50 seconds. If a
blow-through process is carried out within this time and the device re-
connected with the pipe system, the fault alarm “air-flow sensor module
fault” is not activated. If another blow-through process is necessary, the
above process must be repeated
at the earliest after 120 seconds.