TITANUS
SUPER·SENS
®
Commissioning
TSS_07_A-en-e Data:
02/09
7
– 1
7 Commissioning
For a later verification of the air flow value register the commissioning
temperature, air pressure and height above sea level in the commission-
ing protocol.
Check of Settings
Before the commissioning check the settings of TITANUS
®
(chapter 5.3
"Settings"). Then, connect TITANUS
®
to the power supply.
After max. 4 minutes the detector head of TITANUS
®
is ready for opera-
tion.
Fig. 7.1: Check for tightness
For the commissioning of TITANUS
SUPER · SENS
®
install the complete
pipe system and connect it.
Check
Verify
if...
1. the pipe system is correctly attached to the pipe connector of
TITANUS
®
.
2. all pipe fittings are glued and the pipe system is airtight.
3. the air sampling points are fitted with the correct aspiration-reducing
film sheets.
After the adjustment of the air flow sensor (chapter 7.1 "Adjustment Air
Flow Sensor") modifications are not allowed anymore. If modifications
are effected later on the air flow sensor is to be re-adjusted.
INSTRUCTION
INSTRUCTION