4.2.3 Sensitivity and pipeline project planning
4.2.3.1 Pipeline
project
planning with pipe accessories
The following project planning tables for pipeline project planning can be
found in the appendix for each previously selected pipe accessory.
z
Project planning without filter
z
Project planning with LF-AD air filter
z
Project planning with LF-AD-1 air filter
z
Project planning with LF-AD-2 air filter
z
Project planning with SF-400 / SF-650 air filter
An area can be monitored with more than detection points than re-
quired by the national guideline in order to improve an air sampling
smoke detection system’s detection quality. In such case, the number
of normatively required sampling points is to be used in calculating the
required sensitivity of an air sampling smoke detection system.
INSTRUCTION