TITANUS
SUPER·SENS
®
Installation
TSS_05_A-en-e Data:
02/09
5
– 3
5.3
Settings
5.3.1
Base
board
Fig. 5.2: Settings on the base board of TITANUS
®
Contact I (9) of the switch S2 has no function.
5.3.1.1
Delay Period of the Air Flow Fault
Delay Period
Set the delay period for the transmission of the fault signal via the
switch S2 (A, B) on the base board (refer to
1H
Fig. 5.2) of TITANUS
®
.
Setting of the Delay Period
Switch S2
Contact A (1)
Switch S2
Contact B (2)
0.5 minutes
off
on
2 minutes (standard)
on
off
15 minutes
on
on
60 minutes
off
off
As a standard a delay period of 2 minutes is set. In areas with faults lim-
ited in time (e.g. air pressure variations) other delay periods – depending
on the duration of the faults – should be set.
TIP