31
VM 5000
OPERATING MANUAL
EDITION 08/2014
ORDER NUMBER DOC2318718
The following points should be noted before commissioning:
Lay grounding cable from the grounding screw on the device to the signal ground
and ensure that all other conductive parts within the working area are grounded.
Connect the VM 5000 electrostatic control unit via the mains cable to the socket
interlocked with the extraction system.
Connect the gun cable to the connector socket and screw into place.
Connect the spray gun to the adjustable, clean air supply.
For compressed air quality, see operating manual for spray gun.
Connect the GM 5000EA or GM 5000EAC to the paint supply as described in the
relevant operating manuals.
Check that all product-conveying connections are correctly connected.
Check that all air-conveying connections are correctly connected.
Visually check the permissible pressures for all the system components.
Check the level of the separating agent in the pump and fi ll up if necessary.
Provide product tank, tanks for fl ushing agent and an empty tank for return fl ow.
The interface on the rear of the control unit must be protected with a cover.
Connect the system to the air supply.
When fi rst commissioning the unit Flush the system in accordance with the
operating manuals for the other components.
Confi guring the Control Unit
see Chapter 7.7
A skilled person must check to ensure that the device and the spraying system are in a safe
state after they are installed and commissioned.
6.8
VERIFYING A SAFE OPERATIONAL CONDITION
Summary of Contents for VM 5000
Page 2: ......
Page 42: ...42 VM 5000 OPERATING MANUAL EDITION 08 2014 ORDER NUMBER DOC2318718...
Page 65: ...65 VM 5000 OPERATING MANUAL EDITION 08 2014 ORDER NUMBER DOC2318718...
Page 66: ...66 VM 5000 OPERATING MANUAL EDITION 08 2014 ORDER NUMBER DOC2318718...
Page 67: ...67 VM 5000 OPERATING MANUAL EDITION 08 2014 ORDER NUMBER DOC2318718...