WAGO-I/O-System 750
Commissioning
93
750-370 PROFINET IO Fieldbus Coupler
Manual
Version 2.0.0
8.3
Real Time Data Exchange Establishment
The IO controller assigns the configured IP settings to the fieldbus coupler based
on the station name assigned in advance. The PROFINET connection can then be
established by the IO controller and the IO device can receive the configured
parameters.
The fieldbus coupler then makes the respective parameter settings of the I/O
modules.
After completing the parameterization phase, cyclic data exchange is initiated
between the IO controller and IO device.
8.4
Perform configuration steps
The particular steps in configuration after complete installation of the IO device
composed of the fieldbus coupler and the I/O modules are listed hereinafter:
1.
Import or install the GSD file into the configuration environment.
(See also the section “GSD file”.)
2.
Generate an instance of the fieldbus coupler from hardware catalog into a
previously opened project space for the particular IO controller.
3.
Check and adjust the proposed device name or the assigned IP settings if
necessary.
4.
Proceed with the hardware configuration. Select thereby the I/O modules to
be used from hardware catalog and adapt the I/O data representation by
using the particular submodule if necessary.
(See also the section “Flexible Configuration of Digital I/O Modules”.)
5.
Adapt the global station settings at the DAP submodule of the fieldbus
coupler if necessary.
(See also the section “Parameterization of the Station Proxy (DAP)”.)
6.
Adapt the module or submodule parameterization of the configured
I/O modules if necessary.
(See also the section “Parameterization of the I/O Modules”.)
7.
Check the update time or the send cycle and the monitoring time of the
connection to the IO controller and adapt the settings if necessary.
8.
Check the connection settings at the port submodules of the fieldbus coupler
and adapt these if necessary.
9.
Build the expected PROFINET IO network topology using on-board means
of the engineering tool. The target configuration is mandatory for the
integration of the fieldbus coupler, if the IO device replacement without
using any tool is also only possible if the expected network topology is
known to the IO controller. On match of expected and real network