78 Mounting
WAGO-I/O-SYSTEM 750
750-8207 PFC200 CS 2ETH RS 3G
Manual
Draft version 1.2.1 from 2017-09-13, valid from FW Version 02.06.20(09)
5.6.2
Inserting the I/O Module
1.
Position the I/O module so that the tongue and groove joints to the fieldbus
coupler/controller or to the previous or possibly subsequent I/O module are
engaged.
Figure 25: Insert I/O Module (Example)
2.
Press the I/O module into the assembly until the I/O module snaps into the
carrier rail.
Figure 26: Snap the I/O Module into Place (Example)
With the I/O module snapped in place, the electrical connections for the data
contacts and power jumper contacts (if any) to the fieldbus coupler/controller or
to the previous or possibly subsequent I/O module are established.