WAGO-ETHERNET-Accessories 852
Assembly
19
852-111 5 Port 100BASE-TX Industrial Eco Switch
Manual
Version 1.0.0
Figure 8: Assembly on carrier rail 1
Figure 9: Assembly on carrier rail 2
4.3 Screw
fixing
The Industrial Eco Switch can be mounted in the boreholes on the side directly.
Use the drilling template to mark the boreholes.