WAGO-I/O-SYSTEM 750
Commissioning
71
750-306 DeviceNet
TM
Fieldbus Coupler
Manual
Version 2.0.0
8
Commissioning
This section shows a step-by-step procedure for starting up exemplarily a WAGO
fieldbus node.
Exemplary Example!
This description is exemplary and is limited here to the execution of a local start-
up of one individual DeviceNet
TM
fieldbus node with a non-interlaced computer
running Windows.
For start-up, three steps are necessary. The description of these work steps can be
found in the corresponding following sections.
•
Connecting Client-PC and Fieldbus Node
•
Setting the “MAC ID” and baud rate
•
Configuring static assemblies