background image

 

500.0037-A

 

Technical alterations reserved

 

6.

 

Attach a washer to each of the cylinder screws and screw them through the anchoring 
sleeve into the drop-in anchor (10mm Allen key) until they line up. 

7.

 

Tighten the cylinder screws to 35 Nm (10mm Allen key), and then tighten them again 
to 35 Nm in the same order to be sure. 

 
 
 
 
 
 
 
 
 
 

  

 

 

  If the installation material supplied cannot be used owing to the quality of the floor or wall, 

installation has to be adapted to the actual conditions. The dowel used must match the 
type of quality of the building material to be anchored into (minimum requirements for 
threaded rods, screws and dowels M12: Strength grade 8.8, DIN 975 with ISO 7089 
discs). Please observ

e the manufacturer’s instructions

 

 

 

Maintenance and care instructions

 

Your safe is essentially maintenance-free. However, we still recommend carrying out a 
lubricating and servicing interval as follows, depending on frequency of use but at least 
every 12 months:  

 

Lightly oil the hinges using penetrating oil (e.g. Brunox Turbo Spray). 

 

 

Open the door and extend the bolt using the handle, then grease lightly using a 
multi-purpose grease (e.g. Motorex 176 GP).

 

 

The chrome-steel shelf can be cleaned using a standard chrome-steel cleaner (e.g. 
Dr. Weigert neoblank spray).

 

 

The varnished surfaces can be wiped down with a damp cloth.

 

 

  

 

 

 

WARNING: 

Do not clean with household chemical products! 

 
Should any mechanical problems or electrical issues occur, please consult your trusted 
specialist dealer or contact WALDIS Tresore AG directly. 
 
 

 

 

Safe wall 

Anchoring sleeve 

Cylinder-head screw 
with washer 

Building wall / 
Building floor 

Drop-in anchor 

Summary of Contents for BASIC 480

Page 1: ...www tresore ch INSTALLATION AND MAINTENANCE INSTRUCTIONS WALDIS BASIC 480 RESISTANCE LEVEL II AS PER EN1143 1...

Page 2: ...an EN1143 1 certified safe A high quality Swiss product checked and approved by the VdS Please read these instructions carefully before setting up your safe For any questions please contact WALDIS Tr...

Page 3: ...1 4 Operation elemnts 2 1 5 Set up 2 Installation 2 2 1 Positioning against the building wall 2 2 2 Anchoring the safe 3 2 2 1 Important prior clarification 3 2 2 2 Preparing the safe 3 2 2 3 Anchori...

Page 4: ...e handle is in the open position and the bolt is retracted 1 2 Weight 1 3 Regulations and insurance For all safes with a net weight of less than 1000 kg professional anchoring either during constructi...

Page 5: ...it must be noted that a minimum distance of 440 mm to the wall must be maintained at the front in order to be able to open the door more than 90 If you also want to be able to use the full light widt...

Page 6: ...le for installing the safe and that there are no wires pipes or similar in the area to be drilled In case of doubt an expert report should be issued to guarantee that the intended assembly location in...

Page 7: ...pattern on the desired position and then drill the anchoring holes with 15 concrete drill and an impact drill The 15 drill hole must be at least 54 mm from the wall floor or at least 84 mm from the s...

Page 8: ...rer s instructions Maintenance and care instructions Your safe is essentially maintenance free However we still recommend carrying out a lubricating and servicing interval as follows depending on freq...

Page 9: ...an alarm system In these cases the alarm system has to have been functional and activated at the time the theft took place and the alarm has to have been triggered and relayed Otherwise the theft gua...

Reviews: