32
Gas Conversion and Specifications
Gas Specifications
NOTE:
*
M
easure burner operating pressure at Operating Pressure Test Point (Lower - Out) on gas
control valve with both burners operating at 'High Flame' setting. Refer to ‘Gas Conversion
and Specification’ Section for further details.
Natural Gas.
(G20)
LP Gas (Propane)
(G31)
Main Burner Injectors
Ø 3.10mm
Ø 1.90mm
Pilot Burner Injectors
Non-CE
0.62
0.35
CE Only
0.45
0.30
Full out (CCW)
1½ turns out (CCW)
Burner Operating Pressure
0.98kPa (*)
(9.8mbar)
2.50kPa (*)
(25mbar)
Supply Pressure
Non-CE
1.13 - 2.0kPa
2.75 - 3.0kPa
CE Only
20mbar
37mbar
Pilot Screw Adjustment
Summary of Contents for FN8120GE
Page 37: ......