4
Specifications
Gas Supply Requirements
- Australia / New Zealand Only:
- UK Only:
Appliance Classification
Category:
II
2H3P.
Flue Type:
A
1.
*
The burner operating pressure is to be measured at the gas control valve outlet test point
(Refer to Fig 2) with one griddle burner operating at 'High' setting. The operating pressure is
ex-factory set, through the appliance regulator and is not to be adjusted, apart from when
carrying out gas conversion, if required. (Refer to the ‘Gas Conversion’ section for details).
Gas Connection
Gas supply connection point is located 130 mm from the right hand side of the appliance, 32 mm
from the rear and 655 mm from the floor and is entered from beneath the appliance. An optional
underside connection is available.
Connection is ¾” BSP male.
Natural Gas
LP Gas (Propane)
GP8910GE/GEC
GP8121GE/GEC
GP8910GE/GEC
GP8121GE/GEC
Input Rating
(N.H.G.C.)
80 MJ/hr
(75,825 BTU)
108 MJ/hr
(102,364 BTU)
80 MJ/hr
(75,825 BTU)
108 MJ/hr
(102,364 BTU)
Supply Pressure
1.13 - 3.40 kPa
(4.5” - 13.5” w.c.)
2.75 - 4.50 kPa
(11” - 18.0” w.c.)
Operating Pressure
0.90 kPa (
*
)
(3.6”w.c.)
2.6 kPa (
*
)
(10.2” w.c.)
Gas
¾” BSP Male
Natural Gas (G20)
Propane (G31)
GP8910GE/GEC
GP8121GE/GEC
GP8910GE/GEC GP8121GE/GEC
Heat Input
(nett)
Nominal
21 kW
28.5 kW
21 kW
28.5 kW
Gas Rate
(nett)
Nominal
2.22 m
3
/hr
3.02 m
3
/hr
1.63 kg/hr
2.21 kg/hr
Supply Pressure
20 mbar
37 mbar
Burner Operating
Pressure
8.2 mbar (*)
26 mbar (*)
Gas Connection
3
/
4
” BSP Male
Summary of Contents for GP8910GE
Page 8: ...6 Dimensions GP L 8910GE GEC GP L 8121GE GEC...
Page 21: ...19 GP8910GE and GP8121GE Wiring Schematics...
Page 22: ...20 Wiring Schematics Wiring Diagram GP8910GE GP8121GE...
Page 23: ...21 GP8910GEC and GP8121GEC Wiring Schematics...
Page 24: ...22 Wiring Schematics Wiring Diagram GP8910GEC GP8121GEC...
Page 32: ...30...