Piping Requirements
•
Every system is different, built to suit the
customer.
•
Typical system will include piping layout/ system
design drawings provided by either approved
project engineering staff or qualified Walinga
personnel.
•
All piping installed must be properly supported.
•
When installing the support points, ensure
that there is enough strength to support a full
pipe line, should the system become
plugged.
•
One support point every 10' is
recommended.
•
Ensure that the main lines are as straight as
possible to maintain maximum conveying rate.
•
Space the inlets and the inlet piping, at a maximum of 40' apart. Or in accordance with
piping layout drawing provided.
•
When installing the inlet lines, ensure that the Y elbows enter from either the side or
the top of the main pipe line. The Y must also follow the flow of the product and air
stream.
•
All the piping should be within 400' of the main
Central Vac system to maintain product air
speed and avoid plugging
•
All compression couplers must be fully tightened,
ensuring a proper seal.
•
Grounding strip must be properly installed,
making contact to both pipes, to ensure total
protection from static electricity build up.
Summary of Contents for Central Vac
Page 1: ...INSTALLATION MANUAL Central Vac Installation Manual...
Page 2: ......
Page 5: ...Components of a Central Vac System 1 2 3 4 5...
Page 6: ...Typical Central Vac Set Up...
Page 11: ......
Page 18: ...Typical System Design...