FOLDSMART GENERAL MAINTENANCE CHECKLIST
FoldSmart General Maintenance Checklist
Maintenance is essential in order to guarantee the safety and the satisfactory operation of FoldSmart
gates. Maintenance checks should be conducted only by qualified maintenance personnel. The following
checklist is intended to record repair requirements, maintenance performed and additional observations
pertinent to the FoldSmart gate. Checklists must be dated, signed and retained for record-keeping
purposes.
Turn OFF power to the gate whenever assembly and maintenance activities
are being carried out.
FOLDSMART GENERAL MAINTENANCE CHECKLIST
To be completed approximately every 10,000 cycles
or 6 months.
Checked
Good
Needs
Attention
N/A
FoldSmart Gate
Serial Number:
1.
Physical structure - no damage to gate panels,
columns, covers. Access panels functional and
secure.
2.
Secure hinge bolts – check for abnormal wear/
misalignment. Lubricate only if necessary.
3.
Secure bolts at linkage arm.
4.
Check all electrical cables for proper clearance from
all moving parts inside column. Fasten as required.
5. Check seal on gearboxes for leaks (gearbox on each
column).
6.
Check infrared beam functionality; clean lens with
damp rag if necessary.
7.
Check limit switch function (located on top of
gearbox).
8.
Check open/close limits – no gate panel “clap/
bounce”.
9.
Ensure stop button is functional.
10.
Check belt tension (1/4” to 1 /2”).
Summary of Contents for FOLDSMART
Page 36: ...36 wallaceperimetersecurity com Phone 866 300 1110 FOLDSMART GATE INSTALLATION ...
Page 38: ...38 wallaceperimetersecurity com Phone 866 300 1110 FOLDSMART GATE INSTALLATION ...
Page 146: ......
Page 147: ...FoldSmart XT Drawings Generic Site Layout and Options ...
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 160: ......