FoldSmart™ Installation and Maintenance Manual
Revision 1 - MAY 2023
49
WIRING 208/230VAC POWER
To connect to 208/230VAC power, take the following steps:
1�
Make sure the AC power is turned off at its source and the DC and AC power switches on the operator
are in the off position.
2�
Remove the High Voltage Protection cover by unscrewing the two Phillips-head screws that secure
it�
3. Toggle the voltage selector switch from 115V to 230V. Replace the High Voltage cover and secure
it. See Figure 3.
4�
Access the input power wires by removing the two Phillips-head screws that secure the High Voltage
Junction Box Cover. See
“Figure 2. Wiring AC Power” on page 46
�
5�
Terminate the power supply wires to the corresponding black and white lead wires terminated in
the top of the screw terminal termination strip.
6�
Terminate the equipment ground wire to the corresponding green ground wire terminated in the
top of the screw terminal termination strip.
7�
Neatly organize all wire connections and replace the high voltage junction box cover. Secure it with
the two Phillips-head screws.
8�
Place the 208V or 230V 1Ø label on the Junction Box Cover over the 115V 1Ø label.
To use the service outlet with
208/230VAC, a separate neutral wire
(white) must be run from the power
source. Make sure the incoming
power wires are sized appropriately
to support the load expected on the
service outlet. Follow guidelines per
the National Electrical Code Article
250.
Figure 3. Voltage Selector Switch
Summary of Contents for FOLDSMART
Page 36: ...36 wallaceperimetersecurity com Phone 866 300 1110 FOLDSMART GATE INSTALLATION ...
Page 38: ...38 wallaceperimetersecurity com Phone 866 300 1110 FOLDSMART GATE INSTALLATION ...
Page 146: ......
Page 147: ...FoldSmart XT Drawings Generic Site Layout and Options ...
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 160: ......