90 t / 800 t
490527A
- 63 -
3
5
2
ø 2 mm (
3
/
32
’’)
56,1 mm (2
13
/
64
’’)
4,5 mm (
11
/
64
’’)
100 mm (3
15
/
16
’’)
65 mm (2
9
/
16
’’)
17,5 mm
(
11
/
16
’’)
17,5 mm
(
11
/
16
’’)
47 mm (1
27
/
32
’’)
69 mm (2
23
/
32
’’)
104 mm (4
3
/
32
’’)
6
4
en
Installation of the operation panel
Cut a hole for the operation panel according to dimensions in the drawing. Try to
install the operation panel on some vertical surface and avoid installation in a place
where it may be splashed by water.
The thermostat is located in the front panel, install the panel in such a place where
you want to adjust the temperature. Do not install the control panel close to any
external heat source, door or window. Please note also that direct sunlight may af-
fect the thermostat.
The length of the control panel cable is 2 m.
Measurements of the control panel installation cut-out
If necessary, predrill holes for the ø 2 mm (
3
/
32
”) screws.
When cutting the hole for the operation panel use the cardboard
box’s model for drawing the hole.
Connect the control panel cable from
the device to the control panel (3).
Use the fastening screws to install the
control panel to the installation cut-out
(5)
When installing the control panel, use a surface
mounting collar (4).
4 pcs screws; 3.5 x 40 mm (black) TX10 are
included.
Installation