background image

 

 

 

 

 

EN  - V2.0

POWER SHARING SMART

INSTALLATION GUIDE

Summary of Contents for Copper

Page 1: ...EN V2 0 POWER SHARING SMART INSTALLATION GUIDE...

Page 2: ...System T NT Chargers 2 2 CAN Cabling CAN H L 3 Configuration 3 1 Master Slave setup and powering on 3 2 Master Configuration 4 Operation 4 1 Status Visualisation 5 Troubleshooting EN V2 0 INSTALLATION...

Page 3: ...1 INTRODUCTION Power Sharing Smart EN V2 0 3 INSTALLATION GUIDE...

Page 4: ...lbox will use that available power Eachinstallationhastheirowncharacteristics Wallboxallowsamostflexibleinstallation The installation is often not connected to the Internet Wallbox does not require In...

Page 5: ...0 5 Connect between 1 and 24 chargers with the Master Any kind of installation Configuration of the system power chargers can be easily changed Up to 250 m distance of communication Possibility to in...

Page 6: ...2 INSTALLATION Power Sharing Smart EN V2 0 6 INSTALLATION GUIDE...

Page 7: ...es wether it is T or NT Copper The way to turn it from NT to T is to change the switch position it has inside Commander or Pulsar There s an specific order for connecting Commander or Pulsar which is...

Page 8: ...e following cable type Ethernet Class 5E no shield 1 pair A total maximum length of 250 m can be installed 2 2 CAN Cabling CAN H L INSTALLATION GUIDE T T NT Copper has two slots for input and output c...

Page 9: ...ander connection 2 4 Instalation Cabling Commander Pulsar Commander and Pulsar only have one slot so the conjunction is done with external terminals INSTALLATION GUIDE CAN H must be connected to CAN H...

Page 10: ...3 CONFIGURATION Power Sharing Smart EN V2 0 11 INSTALLATION GUIDE...

Page 11: ...he power sharing system INSTALLATION GUIDE 0 Slave 8 or 9 Master Any other Normalcharger see installation manual The chargers can be configured in the following way Any combinations are possible The m...

Page 12: ...tion Maximum Current per Phase This value determines the maximum that your installation can carry Typically this value can be drawn from the main MCB that has been installed for this power supply Mini...

Page 13: ...4 OPERATION Power Sharing Smart EN V2 0 14 INSTALLATION GUIDE...

Page 14: ...enough power available for this charger If the power has already been reduced to the m nimum the newly plugged cars will go into this state Once the system has enough power available e g a car is full...

Page 15: ...Pulsar Copper Settings Power Sharing Bluetooth is required PS Status Slave Master Unpaired Slave Master Uncomplete Net Description Succesfully paired slave charger Master Charger Slave charger that ha...

Page 16: ...5 TROUBLE SHOOTING Power Sharing Smart EN V2 0 17 INSTALLATION GUIDE...

Page 17: ...the system Chapter 1 and 2 of this manual is kept identical After the start up this is the default colour on a power sharing net If it lasts more than around 30 seconds then check that the net is con...

Page 18: ...all the CAN cables are properly connected on the chargers Wrong configuration on the master Wrong resistor value between CAN lines Power off all the charger and measure the Ohm resistor between CAN H...

Page 19: ...Revision info POWER SHARING x x...