background image

Tieback Mount

3039A660

Tieback Mount

6

Step 3

Align the two toplink (5) assemblies with the tieback-mount 
holes.

The toplink assemblies must be as perpendicular as possible 
to the tieback-mount holes. If required, move the toplink 
assembly location on the main-base weldment (9). For 
instructions, see 

Install the Toplink Assemblies on page 10

.

Step 4

Complete the following for each toplink:

a. 

Align the toplink (5) with the tieback-mount holes.

b. 

Insert a hitch pin (7) through the tieback mount and 
toplink.

c. 

Insert a linchpin (6) through the hitch pin.

Summary of Contents for 3039A660

Page 1: ...Rev Jul 2022 Tieback Mount INSTALLATION INSTRUCTIONS 3039A660 ...

Page 2: ...read and understand the safety operation and maintenance information in the backhoe Operator s Manual If you have questions or require assistance contact your local dealer the distributor or Wallenstein Equipment IMPORTANT Installation may include metric or imperial fasteners See the bolt head markings to identify the bolt type Metric Imperial Wallenstein Equipment Inc 2021 All rights reserved No ...

Page 3: ...rdous situation that if not avoided could result in death or serious injury and includes hazards that are exposed when shields are removed It may also be used to alert against unsafe practices CAUTION Indicates a potentially hazardous situation that if not avoided may result in minor or moderate injury It may also be used to alert against unsafe practices IMPORTANT To avoid confusing equipment pro...

Page 4: ...Tieback Mount 3039A660 Tieback Mount 4 Tieback Mount Install the tieback mount on the skid steer Tieback Mount Parts Part number 3039L663 Fig 1 Tieback mount ...

Page 5: ... key f Activate the hydraulic controls to remove pressure from the hydraulic system Step 2 Position the tieback mount around the bar on the skid steer The backhoe must have an SQ500 universal quick attach plate installed not included For instructions see SQ500 Universal Quick Attach Plate on page 8 Quick attach plate item numbers are in brackets and defined under SQ500 Universal Quick Attach Plate...

Page 6: ...e to the tieback mount holes If required move the toplink assembly location on the main base weldment 9 For instructions see Install the Toplink Assemblies on page 10 Step 4 Complete the following for each toplink a Align the toplink 5 with the tieback mount holes b Insert a hitch pin 7 through the tieback mount and toplink c Insert a linchpin 6 through the hitch pin ...

Page 7: ...Tieback Mount 3039A660 Tieback Mount 7 Step 5 Align and secure the quick attach plate Turn the toplinks to tighten or loosen them as required ...

Page 8: ...te Parts Item Part Number Description Quantity 1 Z51919 Flat face FP08 x MISO16028 1 2 Z51920 Flat face FP08 x FISO16028 1 3 3035L109 Clevis turnbuckle 2 4 Z71540 Hex Bolt 1 2 NC x 4 4 5 Z11501 Toplink Cat 0 x 10 1 2 x 16 2 6 Z12110 Linchpin 3 16 4 7 Z11232 Hitch Pin 5 8 x 4 1 4 4 8 Z72251 Hex lock nut 1 2 NC 4 Item Part Number Description Quantity 9 3031W101 Weldment main base 1 10 Z14181 Roll pi...

Page 9: ...ted torque wrench with 1 1 16 socket One 1 1 16 open end wrench One socket wrench with 1 1 16 socket Step 1 Align the pivot backhoe weldment 12 with the backhoe main frame for information about the location of backhoe parts see the backhoe Operator s Manual Step 2 Install the eight 5 8 NC bolts not shown and lock nuts not shown four on each side Step 3 Use a calibrated torque wrench to tighten the...

Page 10: ...wrench with 7 8 socket One 7 8 open end wrench One socket wrench with 7 8 socket Step 1 Align the two turnbuckle clevises 3 with the required holes in the main base weldment 9 01675 Step 2 Complete the following for each turnbuckle clevis LH and RH side a Insert two hex bolts 4 through the turnbuckle clevis and the main base weldment b Install a lock nut 8 on each hex bolt c Use a calibrated torqu...

Page 11: ...nt 11 Step 3 Complete the following for each turnbuckle clevis only the LH side is shown a Align the toplink 5 with a turnbuckle clevis b Insert a hitch pin 7 through the toplink and turnbuckle clevis holes c Insert a linchpin 6 through the hitch pin 01677 ...

Page 12: ... and make sure the toplinks 5 are tight For instructions see Connect a Quick Attach Plate on page 5 b Rotate the skid steer plate to the full back position against the solid stop c Support the backhoe on a skid or blocks to prevent unexpected movement d Set the skid steer parking brake e Turn off the skid steer and remove the ignition key f Activate the hydraulic controls to remove the pressure Th...

Page 13: ...ign the holes in the required position 01679 Step 4 Complete the following on each side of the pivot backhoe weldment LH and RH side a Insert a hex bolt through the main base weldment 9 and pivot backhoe weldment b Install a lock nut on the hex bolt c Use a calibrated torque wrench to tighten the hex bolt to 290 lbf ft 390 N m 01680 ...

Page 14: ...er increase torque values by 5 Bolt grades are identified by the bolt head markings Imperial Bolt Torque Specifications Bolt Diameter Torque Value SAE Gr 2 SAE Gr 5 SAE Gr 8 lbf ft N m lbf ft N m lbf ft N m 1 4 6 8 9 12 12 17 5 16 10 13 19 25 27 36 3 8 20 27 33 45 45 63 7 16 30 41 53 72 75 100 1 2 45 61 80 110 115 155 9 16 60 95 115 155 165 220 5 8 95 128 160 215 220 305 3 4 165 225 290 390 400 540...

Page 15: ......

Page 16: ...WallensteinEquipment com ...

Reviews: