02258
Figure 37 –
Check the drive belt tension
02262
Figure 38 –
Drive belt tensioning bolts
02316
Figure 39 –
Engine mount bolts (two of four)
9.8.3 Align the Drive Belt
A laser alignment tool or 50" (127 cm) straight edge
is necessary for this procedure. A laser alignment
tool is the most accurate.
Check the drive belt alignment after every 8 hours of
operation.
The maximum misalignment is 1/32" (1 mm).
1.
Put a straight-edge tool across the face of the rotor sheave.
Point the opposite end of the straight-edge toward the
engine clutch flywheel.
Make sure that the straight-edge is parallel with the face of
the rotor sheave. See
2.
Do one of the following:
• If the edge of the engine clutch flywheel aligns with the
straight-edge, the drive belt is aligned. The following
steps are not necessary. See
• If the edge of the engine clutch flywheel is parallel to
the straight-edge tool, but is not aligned with the rotor
sheave, align the rotor sheave. See
For instructions, see
Align the Rotor Sheave on page
• If the edge of the engine clutch flywheel is not parallel
(is on an angle) to the straight-edge tool, align the
engine clutch. See
For instructions, see
Align the Engine Clutch on page
3.
Do steps 1 and 2 again to make sure the drive belt is
aligned.
02259
1
3
4
2
Figure 40 –
Check the drive belt alignment
1. Engine clutch flywheel
2. Point of alignment
3. Straight edge
4. Rotor sheave
Service and Maintenance
BXT72S
Wood Chipper
58
Summary of Contents for BXT72S
Page 35: ...02220 Figure 20 Set up the machine BXT72S Wood Chipper Operating Instructions 35...
Page 41: ...02225 Figure 26 Transport position BXT72S Wood Chipper Transport 41...
Page 45: ...02227 Figure 30 Storage position BXT72S Wood Chipper Storage 45...
Page 75: ......
Page 76: ...WallensteinEquipment com...