Operating Instructions
WX520, WX520L, WX520T
Trailer Wood Splitter
24
6.3 Pre-operation Checklist
Efficient and safe operation of the Wallenstein wood
splitter requires that each operator reads and understands
the operating procedures and all related safety
precautions outlined in this section.
A Pre-operation Checklist is provided for the operator. The
checklist is important for both personal safety and keeping
the wood splitter in good mechanical condition.
Before operating the machine and each time thereafter,
the following areas should be checked off:
Pre-operation Checklist
Check engine oil level. Top level up as
required.
Check hydraulic fl uid level. Top level up as
required.
Check and lubricate the machine following
the schedule outlined in the Maintenance
section.
Check the wedge and block. Be sure they
are not damaged or broken and is not badly
worn. Repair or replace as required.
Check and remove any entangled material.
Check for hydraulic leaks. Tighten
connections or replace components to stop
leaks.
Check and ensure that all covers, guards
and shields are in place, secured, and can
function as designed.
Check and inspect tires, wheels, and hubs.
Check and tighten all fasteners. Make sure
the equipment is in good condition.
Check that appropriate equipment for
personal protection is being used and in good
condition.
Check that jewelry, loose-fi tting clothing are
not worn. Make sure long hair is tied back.
6.4 Machine Break-In
Although there are no operational restrictions on the wood
splitter when used for the first time, it is recommended
that the following items be checked:
Review the engine owner's manual for break-in
recommendations. Place the machine in a
Safe
Condition
before checking any components. Refer to
After 1 hour of operation
1.
Check that the push block is adequately lubricated.
2.
Check all nuts, bolts and other fasteners. Tighten to
their specified torque level.
3.
Check hydraulic system for leaks. Tighten all leaking
fittings and replace any leaking components.
4.
Check machine fluid levels—Fuel, engine oil, and
hydraulic oil reservoir. Top up as required.
5.
Check for entangled material. Remove all entangled
material before resuming work.
6.
Check tire pressure. Inflate as required.
After 8 hours of operation
7.
Repeat the above steps.