26
11. COMMISSIONING PROTOCOL
Order data
Item no./serial no./fan designation:
Order no:
Plant designation:
Installation company
Company:
Contact person:
Company address:
Tel. no.:
Email:
Operator (installation site)
Company:
Contact person:
Company address:
Tel. no.:
Email:
Installation date:
Commissioning date:
Device type/designation:
Documentation
Yes
No
Installation, operating and maintenance instructions handed over
□
□
Air volume measurement protocol available
□
□
□
□
Visual inspection
□
□
Damage to the housing
□
□
Installation site according to device specifica-
tion
□
□
Suitable weather protection for outdoor installation
□
□
Electrical installation completed
□
□
Condensate connection frost-free and correctly mounted
□
□
Assembly carried out according to assembly instructions
□
□
Pumped medium Conditions according to permissible device specification
□
□
Insulation work carried out on the device and air ducts
□
□
Filter state at commissioning
as good as new □ slightly soiled □ replacement required □ not present □
Fire protection requirements met
□
□
Butterfly valves mounted in fresh air and exhaust air
□
□