Chapter 4 Liftgate Installation
INSTALLATION OF COMPRESSION TERMINALS
Cut power cable (red) and ground cable (black) to length
and install compression terminals.
Strip 7/8” to 1” of insulation from end of cable.
Slide heat shrinkable tubing onto cable.
Insert bare wire into compression nut until it seats.
Note:
Copper wire should be flush with, or slightly
past, the nut.
Grip nut with wrench and turn terminal until nut seats.
GR00299/ GR00300
Position heat shrinkable tubing over terminal and end of
cable.
Shrink tubing using electric heat gun or torch.
Note
: To reduce chance of damaging tube and
cable, a heat gun is recommended.
Apply sufficient heat to produce thin bead of sealant all
around tube edges.
GR00301
Heat shrinkable tubing
Before installation
7/8” to 1”
Beads of sealant
Heat shrinkable tubing
page 32
Summary of Contents for BZ-33
Page 17: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram G page 17...
Page 18: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram with Auto tilt G page 18...
Page 61: ...Add silicone caulk to seal gaps between tracks and vehicle body page 61...