Chapter 4 Liftgate Installation
INSTALL TERMINALS TO BATTERY
Connect red 2GA cable to red quick connector behind
main frame.
Route positive battery cable from lift unit to battery box.
Connect the end of the battery cable from the liftgate to
the circuit breaker as shown.
Apply a generous amount of Dielectric Grease to all
Positive (Hot) Battery terminals and Circuit Breaker
terminals.
Secure all battery cables to the vehicle frame with the
cable ties provided.
IMPORTANT!
Original equipment ground cable
furnished on vehicle should be at least a number 2 Ga.
An auxiliary ground cable should be added between the
engine block and the vehicle frame if engine is not
adequately grounded. When there are two or more
batteries in the installation, all cables connecting the
batteries together must be 2 Ga. or heavier. This
includes all original equipment batteries on this vehicle.
Protect wires from any sharp edges or
holes that may abrade insulated
covering of wires.
Secure battery cable so it does not
come near, or in contact with, other
vehicle wiring, fuel lines, brake lines,
air hoses, exhaust system, etc.
150 Amp
Circuit
Breaker
Copper terminal Link
(10099500) connected
direct to Battery Post
and Circuit Breaker
Positive (Red)
Battery Cable from
liftgate
Ground (Black)
Cable from liftgate
NOTE:
Circuit Breaker is to rest
solidly on the battery to
prevent vibration during
transit.
Battery Box
Apply a generous
amount of Dielectric
Grease to all Battery
terminals and Circuit
Breaker terminals.
page 33
Summary of Contents for BZ-33
Page 17: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram G page 17...
Page 18: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram with Auto tilt G page 18...
Page 61: ...Add silicone caulk to seal gaps between tracks and vehicle body page 61...