Chapter 4 Liftgate Installation
TO RAISE AND LOWER PLATFORM IN
LOADING POSITION.
•
Push raise switch to raise platform
Or
•
Push lower switch to lower platform
GR00107
TO TILT PLATFORM UP AND DOWN.
•
First push and hold tilt switch, then
simultaneously push raise switch to tilt
platform up.
Or
•
First push and hold tilt switch, then
simultaneously push lower switch to tilt
platform down.
GR00108
TO FOLD PLATFORM TO CLOSED
POSITION.
•
Make certain platform surface is clear of all
objects.
•
Raise platform to bed level with raise
switch.
•
Push and hold tilt switch then
simultaneously push raise switch to close
platform.
•
Turn shut-off switch off
GR00110
page 46
Summary of Contents for BZ-33
Page 17: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram G page 17...
Page 18: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram with Auto tilt G page 18...
Page 61: ...Add silicone caulk to seal gaps between tracks and vehicle body page 61...